Home
Estimating Performance Time For Air Force Military Construction Projects by Greg J Hoffman, Paperback | Indigo Chapters
Loading Inventory...
Coles
Estimating Performance Time For Air Force Military Construction Projects by Greg J Hoffman, Paperback | Indigo Chapters
From Greg J Hoffman
Current price: $60.51
Coles
Estimating Performance Time For Air Force Military Construction Projects by Greg J Hoffman, Paperback | Indigo Chapters
From Greg J Hoffman
Current price: $60.51
Loading Inventory...
Size: 0.49 x 9.69 x 0.94
*Product information may vary - to confirm product availability, pricing, shipping and return information please contact Coles
The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e. g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects. As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations. | Estimating Performance Time For Air Force Military Construction Projects by Greg J Hoffman, Paperback | Indigo Chapters