The following text field will produce suggestions that follow it as you type.

Coles

Loading Inventory...
Economic Feasibility of Installing an Anaerobic Digester on a Department of Defense Installation

Economic Feasibility of Installing an Anaerobic Digester on a Department of Defense Installation in Vernon, BC

By None

Current price: $59.00
Buy Online
Economic Feasibility of Installing an Anaerobic Digester on a Department of Defense Installation

Coles

Economic Feasibility of Installing an Anaerobic Digester on a Department of Defense Installation in Vernon, BC

By None

Current price: $59.00
Loading Inventory...

Size: Paperback

Buy Online
*Product information may vary - to confirm product availability, pricing, shipping and return information please contact Coles
Improving technology has made anaerobic digestion a viable method for disposing of organic waste and creating alternative energy. The purpose of this research was to examine the feasibility of installing an anaerobic digester on a Department of Defense installation, and measure its contribution to the execution of Executive Order 13423. A present worth equation was derived in accordance with 10 Code of Federal Regulations 436 expressing viable costs and benefits of an anaerobic digester. A case study of Wright Patterson Air Force Base (WPAFB) was then presented using the derived equation and operational data from functional digesters in the Ohio area. The research identified that an anaerobic digester at WPAFB is not financially practical at this time, but would contribute towards the goals of Executive Order 13423. The derived cost-analysis equation can be applied to any U.S. military base.
Improving technology has made anaerobic digestion a viable method for disposing of organic waste and creating alternative energy. The purpose of this research was to examine the feasibility of installing an anaerobic digester on a Department of Defense installation, and measure its contribution to the execution of Executive Order 13423. A present worth equation was derived in accordance with 10 Code of Federal Regulations 436 expressing viable costs and benefits of an anaerobic digester. A case study of Wright Patterson Air Force Base (WPAFB) was then presented using the derived equation and operational data from functional digesters in the Ohio area. The research identified that an anaerobic digester at WPAFB is not financially practical at this time, but would contribute towards the goals of Executive Order 13423. The derived cost-analysis equation can be applied to any U.S. military base.

More About Coles at Village Green Shopping Centre

Find everything in-store including new, used and children’s books, music, movies, games and toys. Visit Coles today to find the perfect gift, or a novel for yourself. COVID-19 UPDATE: Open | Regular Centre Hours

Find Coles at Village Green Shopping Centre in Vernon, BC

Visit Coles at Village Green Shopping Centre in Vernon, BC
Powered by Adeptmind